A leaking second story courtyard above a condominium living area requires the topping slab to be removed to access a failed waterproofing membrane. It will be replaced with a CIM waterproofing membrane and, instead of tile or concrete, a paver system will be installed for ease of detection and repair of any future leakage.

Removing topping slab to gain access to the failed membrane

Foundation slab with sheet metal flashing perimeter

Sheet metal flashing in place

Testing the CIM membrane after installation

Beginning to set pavers in place

Cutting pavers around perimeter

Completed paver courtyard