Leakage from the sidewalk into a storage and electrical facility basement required replacing the failing membrane and sidewalk. In order to allow for foot traffic in and out of Tiffany’s, the project was divided into two lengthwise segments with 3 bridges to accommodate entries to and exits from the building.