Featured Project: 2189 Market St

A leaking second story courtyard above a condominium living area requires the topping slab to be removed to access a failed waterproofing membrane. It will be replaced with a CIM waterproofing membrane and, instead of tile or concrete, a paver system will be installed for ease of detection and repair of any future leakage.

 

Removing topping slab to gain access to the failed membrane
Removing topping slab to gain access to the failed membrane

 

Existing failed sheet membrane
Existing failed sheet membrane

 

Foundation slab with sheet metal flashing perimeter
Foundation slab with sheet metal flashing perimeter

 

Sheet metal flashing in place
Sheet metal flashing in place

 

Testing the CIM membrane after installation
Testing the CIM membrane after installation

 

Water test walking boards over flooded courtyard
Water test walking boards over flooded courtyard

 

Beginning to set pavers in place
Beginning to set pavers in place

 

Cutting pavers around perimeter
Cutting pavers around perimeter

 

Completed paver courtyard
Completed paver courtyard